OUR PROJECT

IMPROVED ELECTRICAL SYSTEM

Construction l Don muang l 2021

115KV TERMINAL SUBSTATION

Construction l Angthong l 2021

 

115/22 kV Substation 2

Construction l The Royal Thai Navy Electric

Pharmaceutical Factory , Phase 2

Construction l Pathum Thani 

© 2024 All Rights Reserved. PECCO-TH